EasiLinc Customers are Really Happy:
"We had a very tight schedule of just 10
days to do our outages. The POWER
Engineers EasiLinc panel came pre-wired with the test switches and basically
the installation time was cut in half. All we had to do was cut a hole in the panel; install the plate (chasis)
with the relay and test switches and then wire from the test switches to
our terminal blocks. So the installation time was quick
and we were able to keep our schedule. This saved us time and money."
-- Sandy Rainey, NCPA Hydroelectric Operations,
Technician Supervisor
"When we first
started planning to do our relay upgrade, virtually everyone we talked
to said it would take two weeks to remove twenty single function relays
and install five of the new microprocessor relays.
[With EasiLinc] We did the job, completed it in eight days,
including removal of the old system, installing the new system and
testing it and commissioning the relays. The reason why we were able to do that is the modularity of the
EasiLinc modules, where essentially half the wiring was already done for
us."
-- Kevin Ricks, NCPA Combustion Project
#2, Lead Technician
"I don't know many other products like it out
there that are in a package that can take this complexity for you
and make it simple."
-- Tony Rusin, LL&P Meter and Substation
Technician
|