EasiLinc Customers are Really Happy:

"We had a very tight schedule of just 10 days to do our outages. The POWER Engineers EasiLinc panel came pre-wired with the test switches and basically the installation time was cut in half. All we had to do was cut a hole in the panel; install the plate (chasis) with the relay and test switches and then wire from the test switches to our terminal blocks. So the installation time was quick and we were able to keep our schedule. This saved us time and money."
    --
Sandy Rainey, NCPA Hydroelectric Operations, Technician Supervisor

"When we first started planning to do our relay upgrade, virtually everyone we talked to said it would take two weeks to remove twenty single function relays and install five of the new microprocessor relays. [With EasiLinc] We did the job, completed it in eight days, including removal of the old system, installing the new system and testing it and commissioning the relays. The reason why we were able to do that is the modularity of the EasiLinc modules, where essentially half the wiring was already done for us."  
  -- Kevin Ricks, NCPA Combustion Project #2, Lead Technician

"I don't know many other products like it out there that are in a package that can take this complexity for you and make it simple."
  -- Tony Rusin, LL&P Meter and Substation Technician